Moving along more headstones were reset in Section 1800 as part of today’s work. Foundations were uncovered and the surface leveled with concrete and shims when needed. The base of the stone was set in place and cemented. Then the stone was reset on the base. Mortar was used when the surfaces were rough and stone adhesive when the surfaces…
Category: News
Resetting Section “HI” headstones
Moving along today the headstones resetting operations proceeded down Rows H and I. Foundations were uncovered and the surface levelled with concrete and shims when needed. The base of the stone was set in place and the stone itself reset. Mortar was used when the surfaces were rough and stone adhesive when the surfaces were smooth as in marble. In…
You must be logged in to post a comment.